Hello, welcome toPeanut Shell B2B Foreign Trade Network_Professional B2B E-commerce Platform_Free B2B Information Publishing Network!
18951535724
title Using lockers
Main products Building materials
investment cost 101,000
Business model Concession
region Beijing
Leave a message 暂无
Hits 998
Update time 2026-09-18 07:20
expiration time
Franchise Details

Join process


1. Access to product information

Prior to the use of the lock-in, those who intend to join the alliance consult the website on the accession in the form of an online message. You can also get information about the use of the locket on the internet。

Field missions

Visit the headquarters of the company using the locks to interact in depth with the hosts and to learn about the company's operations。

3. Application for membership

Upon completion of the membership study, the decision to join the association will allow the submission of the membership application form and other relevant documents to the company。

4. Contracting

A contract for cooperation with the union was formally signed after confirmation of the results of the visit by the headquarters of the locker with the two parties。

5. Location of the shop

Under the guidance and cooperation of the regional operations manager, the shop, the warehouse address and the designated market operations strategy are selected。

6. Shop improvements

The company designed the renovation programme according to the condition of the shop, and identified drawings with the association and made improvements with the association。

7. Training of personnel

All-round training in technology, management, operation, etc., is conducted and evaluated at headquarters。

8. Preparatory activities

Once the shop has been built, the association also needs to prepare its opening activities and promote it。

9. Opening operations

You can use a lockbox to guide you in the opening of your business。

Use the locker for details

Established in 1932, the lock-in plant is an integrated national lock-up professional and a national priority。

There are currently 40. 96 million fixed assets in the lock factory, covering 22,000 square metres of land, 35,000 square metres of construction, and a total of 460 units of equipment, of which 18 have been introduced, 48 have been tested, and complete product development, process design, manufacturing, inspection control, etc. "market" and "use" locks cover the national market, and various types of locks are produced, including building locks (spherical, bullet-shaped, blade-plugs, external door locks, plastic door locks, ic card electronic door locks); traffic locks (ships, cars, trains, subways, aircraft); and special locks (gold boxes, silver banks, heat, radios, prisons). Among them, the car door lock, which began production in 1958, is a "red flag" and "shanghai" car support unit. During the "eighty-five" period, our plant invested $30 million in a 150,000 santana car lock-in national chemical rehabilitation project, the introduction of key lock-making equipment, the introduction of ug 3d software for product development, and the improvement and upgrading of processing processes, assembly methods and testing techniques. Four main categories of car lock series, mini-lock series, large- and medium-sized bus lock series, heavy-car lock series have been formed, with an annual production capacity of 500,000 car locks and one of the main suppliers of popular car locks in shanghai。

The "market" and "use" lockers were awarded the first beijing international fair silver and class and city-level new product prizes, which were well known at home and abroad, and sold to japan, the united kingdom, south-east asia, europe and the united states。

In order to ensure that quality products and services are available to users, iso 9002 certification was adopted in 1999; in september 2000, my factory passed the qs90000/vda6. 1 international standard certification of the german company rhine。

Note: the amount of investment in this project, the number of registered shops, the number of registered areas and business models are based on more recent advice! We suggest that you can make a free call with the company and get timely updates on the project below [messageboard message] or call for advice (comparisons between business requirements and suggestions of learning about multiple projects). Enter the network and ask for more information on the projects。

>Related Comments
No comments yet, be the first to comment
Contact Us

You are not logged in, please log in to view contact information


>Investment