1. To understand the system of co-operation in the project of the snail amma powder。
2. A project tour to the snail amalgamation headquarters to visit the door shop, confirm the project and submit an application。
3 advisory opinion, project identified and letter of intent signed。
4. The parties confirmed that the results of the mission were not disputed and entered into a formal contract。
5. Contract signature and completion. Cooperation contract description (investors need to be fully informed about the content of the cooperation)。
Investors choose the location of the shop and submit the shop floor plan and photographs inside and outside the shop to the general corporation。
7. The schema powdering union headquarters designs programme drawings based on shop conditions, and the investors arrange renovations at their own expense at the company's request。
8. The investor arranges for the opening of a store, such as the recruitment of staff, the opening of a store, the installation of telephones, the installation of computers, etc。
9. Investors prepare for the opening of shops and renovation companies to assist in planning, training, distribution and promotion。


