Hello, welcome toPeanut Shell B2B Foreign Trade Network_Professional B2B E-commerce Platform_Free B2B Information Publishing Network!
18951535724
 
 

The asphalt floor is new, the cold is changed, the new suit is replaced, the package works are done

Price ¥75.00Compare
Shipping ShandongQingdao
Shipping Free Shipping
Sales Volume None
Reviews Already 0 reviews
Popularity Already 5 followers
Quantity
+-
Stock10000Square metres
 
Contact Us
Follow0

Qingdao chang-hong-seok landscape engineering ltd

企业会员No.1Year
ProfileUncertified
DepositUnpaid
  • Shandong-Qingdao
  • Last Login 10-05 10:28 •
  • 874662897@qq.com
  • 15969835221
  • Lee jianyong (先生)  
Brand
Aoshima is a great man
Product characteristics
It's beautiful and persistent
Retardability
Satisfactory
Flatness
Smooth
Specifications
2mm-3mm thickness
Feature services
Free sample
Scope of use
Municipal roads, parks, walkways
Scope of use
Asphalt, fluid concrete, cement, plastics
Sellable land
National
Colour
Colour pattern customizable
Product introductionProduct introductionProduct information
  • Product category: ground-based adaptation

  • Fortress: chang qiang qiang

  • Ground type: asphalt land

  • Materials: polyurethane

  • Colour: colour custom colour

  • Work: packages

  • Price: area colour scheme pricing

Product actualThe product making plansMaterials

Alternating paints for oily roads

The main ingredient is polyurethane material, which allows for colour

SaturationHigher。

For concrete roads, asphalt roads, and pedestrian roads

ProvinceBoardCement, concrete, etc

ChangeColourConstruction。


Characteristics

       The construction is less costly than other forms of coloured road-storage construction, is simple in process and has a beautiful and durable colour cover. There has also been a significant increase in the adhesiveness, intensity, durability and resistance to the surface of the road. It's not easy to get off, get up and fade。

 

Process

It's in cold, high temperatures

We can do the same thing

You can walk for hours, you can open for 24 hours

Transport, if construction temperature is below 0°c

Due extension of traffic opening hours at 0-35 temperatures

The construction is suitable between degrees。

 

Construction

 The surfaces of the roads to be redone will be cleaned and completely dry before they are re-engineered and, in case of loose collapses and so on, the surfaces should be repaired before construction is completed and the ground is kept dry without water。


Product detailsProduct detail drawingConstruction plansImpact chartImpact chartImpact chart


Product useProduct useMain camp project


Purchase instructions01 pre-construction preparation

1. The new black asphalt layer requires finer asphalt flatting, pressure, cooling.

2. Old asphalt surfaces need to be patched, washed, pre-spray interfaced。

Facilities such as electricity and water supply, transport roads, mixing and stacking of sites, shed stores and fire protection should be addressed prior to construction。

02 construction process

1. Match and mix as required。

2. Contamination-proof treatment in accordance with road design requirements。

3. The modified high-molecular emulsion is proportional to the coloured powder and is fully mixed with a high-speed mixer of three minutes and three minutes... And two minutes for backup。

4. Disturb the mix into the sprayer

5. Colored coating of polymers after drying (2 ~ 4 hours)。

03 about colors

Colour card selection, with regard to faded — previous years were not coloured, while the road surface, after several years of use, was tardled with car wheels and the environment

The asphalt in the mix will age and the colours will become darker, as the adhesive binds fall, the surface of the surface will be loose, the pits

It's obvious, like light color, so it can also be colored with a colored surfaceSpray complementary。

04 about the customer service

Contacts are on the phone. We can wire the details. Thank you

05 on sale

The company has after-sales personnel, which are repaired free of charge during maintenance, except for non-quality issues。

06 on construction

Consultations with a on construction time。


Company Profile
Company Name
Qingdao chang-hong-seok landscape engineering ltd
Unified Social Credit Code
Date of Incorporation
2025
Enterprise Type
Enterprise
Registered Capital
200万(元)
Contact Us
15969835221
Unfilled
Business Scope
General projects: construction of the greening of the garden, construction of the stone works, construction of the metal doors and windows, construction of the facilities for the sports field, sale of construction materials, sale of architectural and deco
Contact
Name
Lee jianyong
Mobile
15969835221
Department
销售部
Phone
15969835221
Fax
15969835221
Email
QQ
346655709
Skype
Price Description

Price: The displayed price of Xiangpin on the Peanut Shell B2B Foreign Trade Information Platform may vary depending on Xiangpin's participation in activities, purchase quantity, or selected regulations. If the user reaches an agreement with Xiangjia offline, the settlement price of the offline agreement shall prevail. If the user completes an online purchase on the Peanut Shell B2B Foreign Trade Information Platform, the final settlement price on the order settlement page shall prevail.

Flash sale price: The promotional price of a product participating in marketing activities may also vary depending on the purchase quantity or selected specifications, and the final price will be based on the order settlement page price.

Flash sale price: The promotional price of a product participating in marketing activities may also vary depending on the purchase quantity or selected specifications, and the final price will be based on the order settlement page price.

ReportFavorite 0