Tn5048 pulls the rod to the exhaust test machinePacking polesKenTiredTester, puller lock switch test
Instrument profile
The machine is capable not only of testing pullsticks for fatigue (which can be tested in fractions) but also for pullstick lock switches。
At a certain frequency of pull-off and pressurization, the pull-up is carried out continuously and continuously through the pull-out and binding of the pull-up to check the end-of-the-life fatigue performance of the pull-up and the degree of the bonding and switching。
Device structure
Control mode: plc control, large touch screen display。
2. Sample fixation device: the package fixed。
(c) a pull rod, with a lock on the pole, and an automatic switch。
4. Supporting gear: not less than 1,500 mm, with extraction and binding of the course guide。
5. Puller lock switch: simulates a manual press pressure pull, which adjusts according to the type and location of the puller lock, automatically controls the switch of the puller lock, and determines the value of no influence。
6. Power values recorder: record the force values required for pull rods to pull out along the axis and crush. The power sensor is placed at the four angles below the stationary device of the sample, evenly distributed, and records the strength received during the pull and pull。
Technical parameters
1. Test process: 20 ~ 100 cm adjustable, transposition recorder, log and set-up shift, grant controlled at > 1 mm
3. Ration speed: 0-30cpm adjustable
4. Number of alignments: 1~999999
General test height: 200 cm
Test power: the cylinder provides
7. Gas sources: 5~8kg/cm2 (as provided by user)
8. Power: ac 220v, 50hz
9. Weight: 150 kg
10. Outer dimensions (lxwxh): 120 x 120 x 210 cm
[based on criteria]
Qb/t 2919-2018, qb/t1586. 5, qb/t 2155 etc

- please approve the purchase of the products of our division, all of which are certified with a copy of the product, warranty card, certificate of certification, inspection report, etc., and have its own code
- selfless teaching: installation of training, operational steps, attention, maintenance, test details, etc。
- this is not necessarily the current, all of which is based on what is actually happening in our department。
- as a result of the upgrading of product performance and functionality, the appearance of the product will change。
General saftoNny / saftomy, commercial and quality inspection units rely on equipment suppliers
Our division products have been certified by the agency, the metrology and testing centre and the south china metrology and testing centre have been certified and have received high-reliability praise from a wide range of clients, both at home and abroad. It was used by a number of large testing laboratories and brand vendors
Sgs, bv, intertek, str, tuv sud, tuv rheinland, cti, etc
Honours and certificates:

Standard export packaging:

After-sale service commitments and training programmes
1. Installation, debugging
Our post-sale service engineers were deployed to install all contracted products and systems and debug the equipment into normal operation。
2. Free training
2. 1 training time: in conjunction with the stages of installation, commissioning, commissioning and commissioning of applications, five days of training, depending on the circumstances
2. 2 training content: equipment doctrine, installation, commissioning, operational use, equipment repair, troubleshooting, routine maintenance, etc.
2. 3 training methods: human face-to-face training combined with equipment and training materials
2. 4 location of training: centralized training using equipment on site or organized by the buyer
2. 5 teaching staff: post-sale service engineers
2. 6 level of training: the trainees are skilled in the content of the training
2. 7 number of personnel trained: 1-3 operators trained on site or selected by the user。
3.
3. 1 equipping period: 1 year
3. 2 any failure of the system during the product period (any product quality problems due to defects in product design, process, materials, packages) by the supplier, without payment, to assume the obligation of failure maintenance, replacement of spare parts and maintenance
Upon completion of 3. 3, maintenance services and maintenance are provided for life。
4. Maintenance response and fees
4. 1 maintenance failure response time: our company responded within two hours of notification, both during and after the period. If a problem is solved at the door, the engineer arrives at the scene within 24 hours
4. 2 fees: maintenance and replacement of spare parts free of charge during the period, due to the quality of the equipment itself; after the period, all other items are free of charge, except for replacement materials and accessories。
5. Service plan
5. 1 the sale of equipment is managed through a sales customer management system, which regularly alerts the after-sale service to follow-up services, such as maintenance of equipment, installation of consumables, and regular customer returns and usage surveys
5. 2 “preventive maintenance” after-sale services: maintenance services such as free door-to-door check-ups, operational parameter adjustments, cleaning of equipment, operation of equipment and extension of useful life are provided for life, regardless of duration and beyond.
5. 3 during the one-year warranty period, if the upgrade of the company's instruments is required to meet the new standards as a result of the upgrading of the relevant standards, we will actively cooperate in the use of the unit modifications, the costs of which will be borne by our division。
6. Free and long-term technical advisory services
6. 1 the after-sale service department of the company has a technical support engineer who advises clients on technical questions, provides timely responses and maintains long-term, good technical exchanges and collaborative relationships with users。
Tomy town community international testing technology ltd



