1. Pre-selected high-quality documents - as much as you can get, equipment repair, maintenance records, uniform number, mechanical name cutter specification, date of acceptance, maintenance unit, maintenance maintenance unit, protective warranty, bearing 1, examination of blade blades, request for replacement of blades. 2. The correctness of the rodent rodents was checked and the rodents were found to be normal. 3. All parts of the situation are secured, loose, accessible and fully secured. 4. Checks were made to determine whether the oil in the tank was lower than the carving line and the oil was added. Once checked and maintained, the cutter meets the requirements for use. Receiving and inspection officer: maintenance/maintenance officer: uniform number for equipment repair, maintenance record specification for carpentry bed date of receipt and inspection maintenance unit maintenance security inner unit 1, inspection of axle bearings and lubricating oils after 12 hours of operation has been performed and operators are required to apply the required adjustments slide
Oil. An inspection of the processing surface and slides and whether the screws were coated with stain-proofing agents was carried out. 3. A survey and information examination of whether the machine bed operated continuously under the load for more than eight hours found that the machine bed operated continuously under the load averaged three hours. A check was made of the looseness, collisions or injuries in the various parts and maintenance was performed at the site. It is understood that after repair and maintenance, usage requirements are generally met. (a) equipment repair, maintenance records uniform number; 2. Require operators to add lubricant oil in a timely manner, using a main bearing that has a better and desirable processing effect and an extended service life, and adding high-speed lubricant oil after several months of use. 3. To ministries
No anomalies were detected when the items were relaxed. 4 triangular belts were replaced to meet usage requirements. All observations are checked and all meet the requirements for use. Receiving and inspection person: head of maintenance: equipment repair, maintenance records, uniform numbering machine name, insertion of thruster specifications, date-of-acceleration maintenance unit maintenance warrant 1, inspection of whether the shock rod was cleared in a timely manner after use, and clearance of non-compliant sites. Operating workers are required to clean up electrically motivated surfaces in a timely manner to ensure their heat dispersion. The electrically motivated sealing and insulation were checked and found to be relatively dry. Damage to other components was checked and duly repaired. 5. The storage of the soft axle hoses was checked and found to be in the correct form, using a straight-line flat. The electrical motor bearing period was cleaned and the grease replaced. After maintenance
Item 4 meets the requirements for use. Receiving and inspection person: head of maintenance: equipment repair, maintenance records, uniform numbering machine, carpentry mat specification, date of acceptance, maintenance unit, maintenance warrant 1, work surface inspection, no tools and miscellaneous items were found. 2. The lubrication and knives on the machine floor were checked after the shutdown and all were found to be normal. 3. Operating workers are required to clean the machine bed each time they have completed their use and to add lubricant to the slide portion. 4 there was no investigation of any malfunctioning of the machine bed. 5. A survey was conducted on whether the temperature of the bearings at work exceeded 70, and no more than 70. All of these requirements have been complied with after examination. Receiving and inspection person: head of maintenance: d/jg-cx-6-01-j309 equipment repair, maintenance records, standard numbering machine decoder specifications, maintenance unit maintenance at receiving and inspection date
On the surface, rustproof oil is added and placed in dry indoors. 2. The triangulation strips were inspected and found to be loose, with adjustments to make them loose and appropriate, and the work disk was converted to 180 degrees, so that the parts of the machine were evenly worn and their useful life extended. Operating workers are required to clean and keep clean the iron oxides and rust on the worksheets and surfaces after each shift. Upon inspection, the construction site was cleaner. The requirement for use is met with certainty by fine detail and maintenance. Receiving and inspection person: head of maintenance: date of receipt and inspection of equipment repair, maintenance records, uniform coded mechanical name, tectonic model maintenance unit, maintenance warranty, internal face 1 inspection to check whether the steel wire headboard pressure plate, card etc. Was loose, no anomalies were detected. The quantity of fuel in the brakes was checked and refuelled. The cleaning of the entire machine was checked and maintained. 4. Reliable sensitivity to security devices
6. Checked and found everything normal. 5. The performance of the brakes and the gaps were checked, and the sensitivity was found to be insufficient, adjusted to meet the requirements for use. The bolt link was secured. The opinion is verified and meets the requirements for use. (b) equipment repair, maintenance records, uniform numbering machine name, construction elevator specifications and model the cleaning of the entire machine was checked and maintained. 3. The reliability of the security devices was checked and everything was found to be normal. 4. The performance of the brakes and their gaps were checked, and the sensitivity was found to be inadequate and adjusted to meet the requirements for use. 5. The wall and bolt links were secured. The opinion is verified and meets the requirements for use. Receiving and inspection person: head of maintenance: equipment repair, maintenance records, uniform number machine name mixer specification model date of acceptance date of inspection maintenance unit maintenance warranty 1 capability, check for cleaning and maintenance of the unit 2. An inspection was conducted to check whether the wires were loose, card, etc. No anomalies were detected. 3. Checked the reliability and sensitivity of security devices