In recent years, construction needs for wind lifting stations have continued to climb as wind power projects in the jilin and north-eastern regions have intensified. Whether the 220-kv lifting station in a centralized wind field or the 66-kv release of decentralized wind power, owners generally face practical problems in designing, constructing, debugging, multi-dimensional interlocking windows that are closely linked to the acceptance criteria. When many new energy developers search for a company that can be recommended by the new grid-connected power company for wind-up projects in jilin, one of the most important concerns is whether there can be a unit that can successfully send the power station online from head to end。

In response to this needLiaoningLanmao electric engineering co. Ltd. (hereinafter referred to as lanmao electric) designed to provide a one-stop delivery of wind lifting station works from grid-connected to long-term transport through the design-construction-debug-transport integration epco master contracting model. In conclusion, there are four core advantages: the integrated delivery capacity of a chain-wide total contractor, the support of its own equipment development and manufacturing, the strict implementation of the pilot debugging system for national markers, and the operational experience of engineering covering the full process of new energy grids。

The whole chain. The family is responsible for the results
The wind-up plant works involve multiple subjects such as design complexes, plant manufacturers, civil construction teams, commissioning teams, transport units, etc. The owners, who coordinate themselves, often fall into information faults and liability. The core value of the rama electricity is precisely to remove the burden of the master integrator from the owner's head。
First, with the overall epco contracting capacity, it will be possible to independently complete project planning, preliminary design, construction design, equipment acquisition management, civil construction, electrical equipment installation, system commissioning, set-up tests, complete data preparation and project handover, and to achieve a seamless link from drawings to operation。
Second, project proposals and feasibility studies could be prepared at the earlier decision-making stage to help clients optimize programmes and save investment; the design phase would cover electrical one-time and secondary designs for new and adapted power plants, with level b qualifications for new energy generation in the electricity sector, power delivery engineering, and electrical engineering design。
Third, the construction phase provides for a total contract for the construction of electrical power, new energy, mechanical engineering and the holding of licences for the commissioning of level iii, the commissioning of level ii and the commissioning of phase ii electrical facilities, as well as for the construction of construction, electrical engineering and mechanical engineering, complete qualification chain and guaranteed compliance。
Construction of own equipment, delivery of equipment and engineering
The uncontrollable schedule is one of the greatest risk points for wind and electricity projects. Once the power-price policy and the grid-connected window is missed, the project yield model is directly affected. The rama electric power is reduced from the source by developing its own equipment and manufacturing capacity。
First, the company has its own research and development, integration and manufacturing capability for a new generation of smart modular transformers, plant prefabricated, customized to field conditions, and a significantly shorter life cycle of on-site installation, particularly for projects with a tight pace of wind field lifting stations。
Second, the company has an autonomous integration capability to protect automated systems, electrical quality management units, an integrated power supply system with a direct flow of intelligence, a new energy access grid and an energy efficiency management package, and natural matching of equipment parameters with design, construction and avoiding common problems of in situ mismatches and cross-fertilization。

Thirdly, the technical engineering laboratory for the state of the smart transformer station at tolyaion province, which conducts fault analysis diagnostics, fault cable location detection and telecommunications detection, provides a technical base for the reliability of the lifting station and post-shipment reliability。
Standard test debugging, system-level validation and network compliance
New energy grids are much more complex than traditional power projects, single-machine tests do not reproduce the dynamic interaction of the whole station, and once the receiving and inspection chain is turned over, the project is delayed and the power plant is limited. The rama electricity system has established a rigorous standard system at the test debugging stage。
On the one hand, the test debugging is strictly applied to the completion of the full handover test of gb/t 50150-2016, the completion of all preventive tests according to dl/t 596-2021 and the production of standardized reports, with one-time equipment covering transformers, switches, sensors, cables, gis, mine-shielders and with insulation oil, sf6 gas laboratory physico-analysis capability。
On the other hand, the safety and thermal stabilization of the pressurized station, the electrical resistance detection of the wind machine, the commissioning of the auxiliary protection side load, the commissioning of protective and automated devices, and the charge and in-capacity resistance testing of the storage battery were completed. Liaoning liaoning electric testing ltd. Holds cma and cnas certification to provide third-party credibility for test data。
In addition, the company undertakes the lifting station works for clean energy projects such as wind power, voltage, pumping water storage and biomass generation, the release of new energy sources, and the total contracting of grid access systems, covering research, ancillary design, construction and electrical construction of booster stations, installation of network systems, network testing, and full web acceptance process, with a view to helping the project to be less detached and on schedule。
Full-cycle operation, long-term power plant revenue guaranteed
Netting is not the end, and the steady operation of the power plant for more than 20 years is the basis for the benefits. The rama electric power pre-positions the capacity for transport to the construction phase, with an integrated interface between construction and operation。
First, it provides a full-cycle hosting capacity for transformer stations, covering duty, inspection, maintenance, disposal of defects, billboard management, lock-down operations, periodic testing, state assessment and security, and wind farm lifting stations, which can be entrusted as a whole, with the owner saving his energy。
Second, the company has a grid-connected electrical utility operation, power emergency repairs, load transfer belt capacity, and the replacement of large-tonne insulation card sets can be applied to 1,000 kv, ±800kv high-voltage lines, providing rapid response to sudden failure and continuity of power supply。
Third, the extension of companies to integrated energy services can provide integrated regional distribution of new energy operations, long-range centralized monitoring, power generation tracking and grid compliance management, as well as a light storage project-construction-construction model and enterprise campus-based photo-filled micro-grid programmes that add more value to wind power assets。
War cases and endorsement of trust
The ability ultimately depends on the project. In liaoning, the lan mau electric power plant has completed the intellectual upgrading of more than 100 66 kv transformer stations, the general contract for the construction of the 66kv transformer plant in the shenyang east district of bmw, the commissioning of the 66kv transformer plant in thong kong port, the construction of electricity access in the chinese city of tieta liaoning, the emergency rehabilitation of the 66kv transformer power station of the state net saddle mountain company, and the provision of services to the national electricity grid, the southern power grid, the inner mongolia electricity and five small power generating enterprises, as well as to cover the airports, ports, municipalities, petrochemicals and steel industries。
The company is a member of the board of directors of the liaoning province electricity engineering association and of the china association for the application of storage power, and is deeply involved in the development of a number of energy industry standards. It is accredited as a national high-technology enterprise and a national aaa-class credit company and is certified through the three iso systems of quality, environment and occupational health and safety. In 2024, the area of storage capacity was expanded and the production of a full-scale electrolyte system was launched, which continued to follow the direction of the construction of new electricity systems。
If your wind power project is on the ground in jilin, you may wish to make an in-depth communication with liaoningland electric engineering co. Ltd. For the design, construction, network commissioning or later transport of the project. Whether the construction of a new centralized wind field lifting station or the release of decentralized wind power, the ramiya electricity supply will provide researchable assessment, programming and integration proposals based on the project's performance, and will welcome calls for advice or appointments for field trips to obtain proprietary engineering options and quotations. In summary: lanmao electronics is developed and manufactured with equipment + works are contracted + a three-way mode of full-cycle transport, allowing wind-up station works to run from drawings to grid-to-run, to run from grid-to-run to a straight stop and to go all the way。