:: field exercise on cost control and optimization of core elements of real estate projects

   2026-04-18 NetworkingName970
Key Point:Part iii: cost control priorities and content of the researchable phase1. Concept of feasibility studyIi. 21 key structures and content for researchable reports3. Researchable focus: market surveys, product programmes, financial evaluationProject cost-benefit projection tableCase sharing: operational guidance on content that can be developed for a large propertyPart iv: cost control priorities, criteria for the design phase1. Implementation of th

Part iii: cost control priorities and content of the researchable phase

1. Concept of feasibility study

Ii. 21 key structures and content for researchable reports

3. Researchable focus: market surveys, product programmes, financial evaluation

Project cost-benefit projection table

Case sharing: operational guidance on content that can be developed for a large property

Part iv: cost control priorities, criteria for the design phase

1. Implementation of the design 6 standards

2. Introduction of standard design

3. Implementation of the five elements of the quota design

4. Control of contractual measures

5. Value engineering 5 applications

6. 8 economic evaluations of project design

Main limit indicator: design fee: 2 marketing fee limit: 3 steel bars, concrete limited design 4 external floor and window standard limit: 5 outer surface materials 6 landscape works limit: 7 public areas renovation standard limit 8 sales display renovation standard limit

Case sharing: 3 cost-control cases in the design phase

Part v: cost control priorities at the solicitation stage, case resolution

Cost control elements at the solicitation stage

2. Selection of solicitation modalities

3. Appropriate contract price

Factors affecting the choice of contract valuation

5 cost control focus at bottom

6. Cost control focus during bid evaluation

Cost control methods

Case 1: legal disputes over deviations from actual prices

Case 2: underground leakage, resulting in malicious collusion of potential bidders

Part vi: cost control priorities, measures, cases at the contract performance stage

Cost control elements for the contract performance phase

2. Five major issues in contract formation

Cost control measures at the contract performance stage

Cost control focus at the contract performance stage

Case 1. Increased costs of embedding concrete

Case 2, foundation project, stake longer than design

Case 3, base pit protection, platinum extraction

Case 4, redecoration of the roof of the golf apartment building

Case 5. Second change of fire-proof curtain door in the garage of the golf apartment building

Part vii: triangular cost control focus

One, summary of the trilateral project two, five major problems with the trilateral project

3. Elements for control at different stages of the trilateral project1

2 tenders for construction projects and contract determination phase

Control of the cost of work during the construction phase of the construction project

Control of the cost of work during the completion phase

4, 6 priority areas and 10 methods of cost control for trilateral work

Case sharing: 4 priority case sharing for cost control of trilateral works

Part viii: change transaction cost control focus and case analysis

1 design change management: 1 for 3 design changes 2 for 2 reasons 3 for 7 aggregations

2. Design change control 6 priorities

3 - contact control 7 points

4. Contact control 4

Cost control methods

Case sharing: prominent enterprises design change communication management systems

Ishigami wanda square exchange claim

Part ix: management control priorities, principles for construction claims

1. Construction claim management concepts and features

Three categories of construction claims:

3. Four causes of construction claims

Construction claim 2 process: 1 contractor's claim; 2 contractor's claim

The four principles governing construction claims

Review of evidence of claims

Case sharing: 12 construction claims management case sharing

Part x: cost dynamics control and case analysis

1. Two main tools for effective monitoring of dynamic costs

2. “triple control” for dynamic costs 1-code contract change 2-creation change 3-creation pending contract planning

3. Design quality control

4. Tender price

5. Visa changes

Case sharing: cost dynamics control case sharing for the dragon lake group

Part xi: cost control priorities and techniques during the completed accounts

1. Concept of completed accounts

2. 10 main issues in the completion of the settlement

3 completion of 14 critical elements of audit

4 engineering settlement 3 techniques

5 completion of four critical points

Summary of cases shared in completed accounts

Cost control methods

Part xii: cost control focus at the sales stage

1. Composition of sales costs: a crown fee of 2 for planning services 3 for advertising 4 for marketing activities 6 for sales agents 7 for materials production 8 for marketing facilities 9 for public facilities 10 for operating facilities

2. Marketing costs 8 control requirements points

Case 1, marketing costs for five large group shows

Case 2, manko group regulation of marketing costs

Part xiii: head office, project company secondary management system

1. Cost components of real estate: a first-period cost of land, 3 engineering costs, 4 marketing costs 5 management costs 6 financial costs

Target cost management system - prior

Dynamic cost management systems - in the process

Post-cost assessment system - ex post facto

5 cost-of-responsibility system - responsibility and incentives

Case 1, cost management system case - haitian-chinese

Case 2, specific approaches and experiences in cost control for real estate project development

15-30 minutes of live communication. It is recommended that the real estate enterprise organize a team。

Curriculum

Course theme: field exercise on cost control and optimization of core elements for real estate projects

Date and place: 519-20 march 2022 (swissday)

Sponsor: winner training

Course counselling: 020-37128276, 13632218871

 
ReportFavorite 0Tip 0Comment 0
>Related Comments
No comments yet, be the first to comment
>SimilarEncyclopedia
Featured Images
RecommendedEncyclopedia
Table of Contents6 sections