   2026-09-13 NetworkingName1700
Key Point:The climate-resilient premise of the fujian decorationsFujian is located in the subtropical oceanic monsoon climate, with high air humidity throughout the year, many storm showers during the summer and fall seasons, and high temperature variability in the winter and winter seasons. Unregulated installation processes can easily lead to late-dressing, deformation, degeneration, etc., and therefore require the installation of a full process for clim

The climate-resilient premise of the fujian decorations

Fujian is located in the subtropical oceanic monsoon climate, with high air humidity throughout the year, many storm showers during the summer and fall seasons, and high temperature variability in the winter and winter seasons. Unregulated installation processes can easily lead to late-dressing, deformation, degeneration, etc., and therefore require the installation of a full process for climate adaptation。

Preparatory work before installation

The first is to complete the grass-roots treatment: the wall is to be completely cleaned with ash, oil and empty drums, the wall pits are to be repaired with flat-slurries to ensure that the wall is not more than 2 mm/2m in size, the water content of the wall is to be measured within 12 per cent, and the wet areas close to the kitchen guards and the balcony are to be painted in advance to avoid later water vapour infiltration affecting surface stability. The second is the adaptation of the materials: when the relevant plates and accessories enter the field, the colours, specifications and quantities are checked, the panels are unmarked, the edges of the floors and drums are checked, and all materials are placed on site for more than 24 hours in order to balance their temperature and humidity with the indoor environment and to avoid deformation as a result of thermal swelling and cold contraction. Finally, the bullet line will be located: the design drawings will eject the wall level, vertical control line, indicate the point of installation of the card button or the dragon bone, and specify the position of the switch intubator, the pre-burial line, and ensure that the layout is well organized。

Home-based step process

Standardized installation construction steps

First stationary: if a dry-mounted installation process is used, light steel dragon bones are installed and evened, and metal components are protected against rust; if a card-button installation process is used, the distance between the card buttons is fixed at 30-40 cm at the point of the bullet, and the edges and the crane links are encrypted and the structural stability is enhanced. Second, the plate is cut: depending on the size of the plate actually installed, the cut is to be razed and unfrozen, and the cut-off section of the plate is to be covered and cut off. The installation of the sheet was then carried out: each installation of a piece of the plate was to be completed using a rule-based correction of the flatness and verticality, with an elastic stretch of 0. 2-0. 3 cm between the plates, a shape-changing space due to changes in the temperature and humidity of the area suitable for the fortune, with the application of a rubber hammer to be used for the minor re-triggering of the position and to avoid the violent impact of the plate damage. Finalization of in-side treatments: use of side-points at the yin-yang angles, window and door openings, different material wall interfaces, smooth and smooth sealing of glue, instant cleaning of excess glue, overall beauty。

Acceptance and maintenance after installation

Home-based step process

Following the completion of the installation, receiving and inspection is carried out in multiple dimensions: the overall wall level level is not more than 1 mm/2 m, the panel is unscathed, bumps, colours are not spread, the seams are smooth, the edges are seamlessly connected and the openings of the openings of the pipes are uncut. The installation was completed within 24 hours to avoid touching and watering and to ensure that the structure was fully fixed。

Industry technology and product suitability

At present, domestic domestic construction materials have been developed for the humid climate in the south, and relevant pasta materials have been introduced in the penang wood industry, suitable for various installation processes, such as dry hangs, card buttons, etc., and suitable for domestic assembly needs in the south region in terms of tidal protection and anti-conformity. Local consumer feedback has been beneficial, and a two-year stay without problems such as an accelerator, deformation, mold, etc., according to the standard process of installation of cosmetics, the overall use experience is in line with expectations。

Knowledge questions and answers

Q: what are the climate-compatible details that need to be focused on for the installation of wood coatings by fujian families

Home-based step process

A: high humidity and significant temperature variability in the fujian region, 24 hours of static on-site adaptation of materials to local humidity, 0. 2-0. 3 cm of stretches for panel installation, and pre-tidal treatment at the floors of the wall, which can effectively reduce the probability of a back-up, deformation and degeneration problem。

 