Government-specific bonds, higher-level earmarked funds, district budgets, corporate self-financing
Composition of sources of funding
Within the central budget: 0; provincial: 0; municipal: 0; bank loans: 0; foreign: 0; self-financing: 0; other: *. 00;
Scope and size of solicitation
The project is located in (slightly) the zone of courage, (slightly) in the south-west, in the northern part of the peninsula of ray state. The total planned land area for the project is 54 acres, with a planned building area of approximately *. 29 square metres and an area of *. 998 square metres; a total of three single-story* steel structural plants (one plant, warehouse*. 4 square metres, two plants 4409. 08 square metres and three plants* square metres) are planned for a fire-resilient level level i; one four-storey spares, fire-resilient level ii; and one public works house, fire-resilient level i. The main construction elements include construction works, road works, outdoors paving works, outdoor lighting works, outdoors plumbing works, etc。
Content of solicitations
The design of the construction plans (which includes, but are not limited to, the design of the construction plans, the preparation of the construction plans), the acquisition of equipment and materials, the master contract for the construction of the plant (construction includes, but is not limited to, civil works, installation works, outdoor works, etc.) until the completion of the works, the completion of and cooperation with the relevant departments in the conduct of the (decided) audit, preparation of the completion plans, maintenance of the works, etc., and assistance in the processing of the elements contained in the solicitation documents and related information, such as the approval and archiving of the receipt and inspection data by the administrative authorities during the construction phase, completion of the inspection and inspection。
Duration (delivery period)
No period set
Maximum bid limit
*.*
Acceptance of consortium bids

Tender qualification requirements (including, but not limited to, qualifications, performance, etc.)
Eligibility requirements for bidders
The bidders shall possess the following qualifications: 1. The bidders shall have an independent legal personality. (b) a total of three (or more) levels of qualification for construction works, a business licence and a safe production licence for the construction enterprise, and a combination of an integrated design * level * qualification or a level * (or more) qualification for the construction industry * or a professional design * qualification for the construction industry (construction work). The intention of the bidders to participate in the tender was made clear and the representatives of the bidders were authorized to do so. 2. Performance or other requirements: 2. 1 bidders (independent or conglomerate) from 1 april 2019 until the deadline for the submission of bids, are required to complete the performance of a building construction project or the performance of the construction tasks performed in the epc project; 2. 2 bidders (independent or conglomerate designers) are required to complete the performance of a building construction project or the performance of the design tasks performed in the epc project from 1 april 2019 until the deadline for the tender. Qualifications require that performance documentation be provided as required by the scale. 3. The project manager to be appointed shall be a builder's certificate registered at the professional level of construction engineering at the tender enterprise and shall be validly certified as a safety certificate (b certificate) and shall not be the head of the construction unit's project on two or more construction projects from the date of opening of the tender, including one of the cases where the successful bid has not been opened, a contract has been signed, and the project is still under construction. Qualifications and qualification requirements for other key positions: the design project manager to be appointed must be a registered member of the unit and have a first-level registered architect. Bidders whose names are included in the list of untrustworthy persons on the “china enforcement (little)” website (http://http://**. Cn/shixin/) and those whose names are included in the list of seriously untrusted enterprises in the national enterprise credit information disclosure system (http://**. Cn) are treated as rejected tenders. 5. This project shall be subject only to the production and submission of tender documents in electronic form. Bidders are required to present (slightly) public resources trading system ca digital certificates and to install mobile phone-based ap trading systems. The holding firm's digital certificate uses the “tender document tool” to produce electronic tender documents, to participate in the bidding process in the trading system and to submit electronic tender documents on time (the details of the processing of the enterprise's bid ca digital certificate and the production of electronic tender documents are available for wider consultation (abbreviated). 6. Legal persons, other organizations or individuals having an interest in a bidder that may affect the fairness of the tender may not participate in the tender. A bidder shall not be a substitute for the project, a project management unit, a supervisory unit, a price advisory unit or a tender agent. The head of the unit, who is the same person or a different unit of control or management relationship, may not bid for the same sector or for the same tender item, which is not divided, otherwise the tender is invalid. 7. In accordance with the circular of the national development reform commission of the ministry of housing and urban and rural development on the issuance of (slightly) general contracting schemes for construction of infrastructure projects (2019) no. 12) requires that a project proposal for a government investment project, a feasibility study, a preliminary design document preparation unit and its evaluation unit should not normally be the master contractor for the project. The tenderer for the government investment project made publicly available the completed project proposal, the feasibility study and the preliminary design document, and the above-mentioned units could participate in the bidding for the master-contracting project. 8. This tender accepted the consortium and accepted only a consortium of not more than two units (betters should submit a tender agreement for the consortium and the sponsors of the consortium bid agreement should process the bid). A consortium of units of the same profession determines the level of qualification according to the lower level of qualification. ;
Performance requirements for bidders
Details are provided on the qualifications of bidders. ;
Use of electronic tendering
Modalities for obtaining prequalification/tendering documents
Download pre-qualification/extension (slightly) address
Http://** uri=https%3a%2f%http://**. Cn%2fggzy-yhzx%2f&client id=gdrz gdsggzyjpt

Ways to obtain paper prequalification/tendering documents
Http://** uri=https%3a%2f%http://**. Cn%2fggzy-yhzx%2f&client id=gdrz gdsggzyjpt
Time of commencement of prequalification/tendering documents
11/04 2024 17:11
Deadline for prequalification/tendering documents
0705 09:30:00
Deadline for submission of pre-qualification/bid documents
0705 09:30:00
Prequalification/submission of tender documents

Bid registration procedures should be performed by bidders in advance of the time specified in the solicitation documents (slightly) - electronic transactions (slightly) and before the deadline for submission of prequalification documents/tendering documents, (slightly) - electronic trading systems for submission of electronic prequalification/tendering documents, and (slightly) - electronic trading systems guidance on the full-process electronicization project. See: (soft) (soft) - eto operating manual
Opening of tenders
0705 09:30:00
Location of opening of tenders
(soft) (soft)
Publicity medium
(slight) (slight) - electronic trading system
Tenders
Guangdong (lao)