(note: annex photo recognition, individual text that may be inaccurate, please refer to annex)
Construction of the light work hills project, phase ii, buildings on the 1-8th floor and gatekeepers
Tender announcement for master contract for construction (including supporting infrastructure)
(tender number: e**)
Area covered by the project: guangxi autonomous region, (slightly), 8-step area
Terms of solicitation
Construction of the light industries project, phase ii, buildings on the 1 - 8th floor and gatekeepers ham
The project has been approved by the approval/approval/documentation authority and is financed from state funds*:
Private funds*: offshore funds*: self-financing*: foreign government and business investments*
For the present (slightly). This project is subject to tender conditions and is now in the form of a public tender
Project overview and scope of solicitation
Size: total building area: *. 48m, of which gatekeeper 1 building area: 72m: gatekeeper 2 building area: 18
M: *. 76m: 2 standard plant building area *. 76m: 3 standard plant building noodles
Volume *. 76m:4: building space for standard plant *. 76m: building space for standard plant *. 76m: 6
Building area 8242. 66 m: 7 living support building area 8286. 53 m: 8 living support building area
. 49m. Construction works are for construction workers (slightly)
Lighting works for firefighting engineering and related ancillary facility works, etc
Scope: this tender is divided into sectors, of which the tender is:
(001) light industry construction project, phase ii, buildings 1-8 and gatekeepers, etc., of the liang gui standard industrial plant, guangxi east industrial complex construction
Building supporting infrastructure:
Qualification requirements for three bidders
(1-8th floor and gatekeeper, etc.) construction
Qualification requirements for bidders with supporting infrastructure: 31 this tender requires bidders to be able to work simultaneously set
Qualifications * or construction industry * and above
Bidders for qualification and construction work, level ii and above, shall be subject to national laws and regulations
Requirements for licensing of qualifications and characteristics of tendering projects, reasonable qualification of enterprises and no upgrading of qualifications yes
Request: if the qualification is based on a master contractor for the construction of the project, no additional professional contractor may be established at the same time:2
(a) tenders for political engineering projects
At that time, construction enterprises registered in guangxi and construction enterprises outside the construction sector participated in the bidding in the form of a consortium
In the case of a joint body, the qualification is based on the highest enterprise: 3/.) with a valid and safe production licence and in the case of a person
Availability of funds, etc. The bidders have been entered into the guangcheng cloud and are in active condition. 3. 2 major
The person in charge of the 3. 2. 1 general contracting project manager has a level i registered architect or level i registered structural engineer or
Registered builder at the professional level of construction and engineering or registered supervisor at the professional level and combined intermediate and above
For which a lead unit employee is required)

Construction project manager or master contractor project manager for works commenced or listed as first candidate for other projects
The supervisory engineer, as the project manager of the general contracting project, is in line with guangxi (slightly) probity card management interim scheme
Article 16, paragraph 1, and gui guang dynamite (2016), no. 70, except 2020, no. 11, required to be appointed and to be established
Design project owner or construction project manager or project director, engineer or master contractor project similar to the project yes
Logically, method 1, the scope of work similar to that of the proposed project is consistent with the performance requirements of 3. 3 enterprises, without limiting the length of time served: two
If the performance of the enterprise is not required, a similar type of work is defined here by the bidder: 3. 2,2 project designer:
There is a first-level certificate of registered architect and a senior professional title in construction-related professions. Comment: (abbreviated) monopolies, etc
The advanced professional title associated with the design of the booking requires that the construction project manager have a level 1 level of construction upgrading
Including the first-level registered builder certificate and middle and above, entered and in a valid state
Effective safe production certificate (class b). Not to accept the fact that the successful bid has not started or has been classified as another project medium
The first candidate for the construction project manager, general contracting project manager, as construction project manager, is in line with guangxiung group
Article 16, paragraph 1, of the interim scheme for the management of field integrity cards and gui guangcheng 2016) 70 pipe
Except for no. 2020, no. 11. 3. 2. 1 full-time safe production manager for construction of division gian: recorded in the guangcheng cloud and located
Effective status with valid full-time safe production managers safe production certificate (c) 3. 3 performance statement
Request: no request. 3. 4 this tender accepts the consortium bid. If tendered by the consortium, the following requirements shall be met:
It accepts the consortium bid. Membership of the consortium may consist of design and construction units, each of which shall be eligible
Conditions for independent legal personality to be able to assume civil liability independently, where the construction unit must have effective security
Production licence. 3. 4. 2 the consortium shall have a letter of agreement in which the consortium leader represents the consortium parties
Members are responsible for the coordination of the sponsorship of the bidding and contract implementation phases, but other members of the consortium contract and performance
In the same process, there is joint and separate legal liability. 3. 4. 3 design or construction unit for bidding of consortium not available
It may again participate in the bidding of the same paragraph in its own name and may not form a new consortium to participate in the bidding of the same paragraph。
3. 1. 4 each consortium shall have responsibility for the division of labour between the consortium's agreements on this project, including in respect of funds for personnel equipment
Compliance capacity within range. 3. 4. 5 enterprises with similar qualifications in the consortium share the same work in accordance with the terms of the consortium agreement
The consortium should be graded by enterprises with lower qualifications. 3. 4. 6 registered in construction in guangxi
The construction industry and the construction industry outside the region are involved in large bridges in the form of a combination of orbital traffic tunnels
For projects such as political engineering, the consortium's integrity evaluation is divided into the most island enterprises
Business calculations, and in the rest of the case, the creditworthiness of the construction enterprise in the consortium is evaluated by a consolidated credit reduction for the construction enterprise among the consortium members
The lowest-rated enterprises are identified. 3. 4. 7 the credibility of the design enterprise in the consortium is divided by the integrity of the design enterprise among the consortium members
The lowest rating was for enterprises. 3. 4. 8/3. 5 each bidder may bid on all the tenders for this tender project and
The successful bid is allowed to be pre-identified by the bidders of all of the fields. The bidders should, however, send different masters of the works on different points
The construction project manager and the dedicated safety production manager for the construction of the project, as opposed to the same general contracting project yes
Refusal of bid processing of other tenders involving the construction day manager or the dedicated project safety production manager
Gui guang dynamite) no. 70 (2020) 11, / 3. 6 bidders ' information is based on guangdong gui
Correct. 3. 7 this item is not part of the government procurement project day. :
This project allows the consortium to bid
Access to solicitation documents

Access: from 1500 hours on 30 september 2022 to 2359 hours on 30 october 2022
Access by potential bidders (slightly) guangxiung (slightly) station free of charge download
Tender documents。
Submission of five tender documents
Date of submission: 31 october 2022 at 0900 hours
Presentation mode (slightly) guangxi manchuria http://ggzy. Jgswj. Gxzf. Gov. N
Submit electronic upload file
Time and place for the opening of six tenders
Opening of tenders: 31 october 2022 at 0900 hours
Tender opening place: local delivery (slightly)
(abbreviated) sign opening subsystem (http://202. 103. 240. 162:8072/bid0ping/) within 60 minutes break
Secret verification. Note: (abbreviated) items on which tenders are opened and whether the bidders are present at the opening of tenders on site are chosen by the bidders themselves。
Seven others
5. Bid documents submitted and bid openings not to meet note 5. 1 shall be submitted by (abbreviated) guangxi
Autonomous region of magnificents (http://ggzy. Http://**. Cn/submitted, deadline for submission of bids, same as below。
5. 2 full-time bidders required to fill out input boxes containing ejected tender documents by tender deadline proposed
(slightly)
Http: /ggzy. Jgswj. Gxzf. Gov, cn/successful. Upload. After the publication of the bidders ' list by the deadline for the submission of bids, the solicitation agency
Click to enter the tenderer to sign the declassification of the tender document for 60 minutes. Signing to decryption time
By the end of the day, the bidders had to open the system through guangxiung
(http://221. 7. 240130:9080/hzbid0pingew) individual ca lock-in for full-time bidders, plus
If the ca locks the decryption of the bid document, if the full-time tenderer arrives (slightly) and the bid is opened, you must have an identity card
The original or electronic identity card generated by the public security system must be certified on site, if the legal representative is present
Site of the original personal identity card or electronic identity card generated by the public security system and photocopies of the company's full-time tenderer's identity card nuclear
) and automatically validate the validity of tenders through guangxiung (slightly) on the sub-system for opening tenders, otherwise the bidder is considered to have dropped its tender
Documentation. Note: bid units, in the production of electronic tender documents, are required to fill in the input boxes of the e-tender and the full-time bidders and
The identification information of the project's main manager is proposed and is carefully confirmed. ) the bidder is to be put into the general contractor project manager or
The construction project manager is marked as having an abnormal registration status and the proposed lead contractor project manager or the construction project manager himself
If you do not have the right to refuse a tender, you must be present at the opening ceremony with the original personal identity card or an electronic identity card generated by the public security system
The bidder will not bid. 5. 3 guangxiung (slightly) bid opening subsystems do not see login by bidders using ie
Browser (1e11) opens a negative login address:
Http: 221. 7. 240130:9080/hzbid (0pingnew), mobile ca login using ca locks or cinnamon transactions. Jean
Move the ca bid process with the guilds, as detailed in the guilds move caapp download 5. 4 for the guilds

Bid documents produced by ca, which can only be used to move ca certificates from the trade in cinnamon when the tender documents are generated break
Tight. The tender documents produced in ca town can only be decrypted from ca certificates when they are generated. 6. Advance payments
You're covered by zero deductions for the cost of building a safe civilization
The advance payment system for the works should be strictly enforced at the french government investment date and the advance payment for the works should not be less than the total contract price less the suspense
(a) up to 30 per cent of the 10-bong and the agreed percentage of the progress payments with respect to the work schedule:
80 per cent of the work performed during the engineering cycle in the contract and 70 per cent of the work performed outside the contract in the engineering cycle
Progress payments for construction of state-owned enterprises in institutional units shall be no less than 80 per cent of the cost of completed projects, including those that have not yet been completed
Impeded advance payment for works 7. Media for publication in china (slightly)
Http://ww. Cebpubservice. Com/guangxi autonomous region (slightly)
Http: /http://**. Cn:9000 and (abbreviated) guangxikha county
Http://ggzy. Http://**. Cn/hzggzy/ (public announcement medium includes, but is not limited to, the above-mentioned coal media)。
(note: public procurement works where tenders are tendered should be in china at the same time)
Http://**. Cn guangxi autonomous region (slightly) http://**. Cn)。
Viii oversight unit
Monitoring of this tender date
Ninth contact
Bidder: hezhou now (slightly)
Address: (soft) 11th floor, hubble ecotech park, eight paces
Contact person: huang
Tel. 0774-*
E-mail: xdey2015e163. Com
Tender agent: guangxi moo xin (slightly)
Address: (soft) second floor, 136 hozhou avenue, taipei community
Contact person: yang yong
Telephone:*
E-mail: /
Tenders or their solicitation agents lord
He's got a lot of money
(signed)
02
Tender solicitation agent
(stamp)
36










